PROJECTS WORKING ON

  1. Camerich Papers (Morbi) – 66 kV Switchyard + Plant Distribution
  2. Omori (Rania) by Kajima
  3. Unicharm @ Sanand – 66 kV Switchyard + Plant Distribution for 30 MVA Load
  4. Canpac Trends Pvt. Ltd., Kerala GIDC.(1500 KVA Expansion Project)
  5. Zydus Research Center, BSL-3 Lab & DMPK Lab(Special lab development – MEP Team)
  6. 66 KV Switchyard @IOCL, Siddhpur (2×6 MVA AIS)
  7. 12.5 MLD CETP @Sanganer  (5000 KVA distribution system)
  8. Steefo Industries(90 KV 1-bay switchyard @Senegal)
  9. SSNNL – 66 kV Switchyard + 11 kV Line (18 km) Distribution + 11 kV Distribution
  10. CEAT LTD, Halol – 66 kV Switchyard
  11. Gujarat Forensic Science University @gandhinagar(Expansion of existing Campus – MEP team)

eDevise: TOOLS PACKAGE UPDATEs:

V No V Date Module Name Tools
1.0.0.0 01-Jan-18 Assorted Area Exhaust Fan Calculation
1.0.0.0 01-Jan-18 Assorted Battery Sizing-BackUp
1.0.0.0 01-Jan-18 Assorted Capacitor Sizing
1.0.0.0 01-Jan-18 Assorted DC Battery Sizing
1.0.0.0 01-Jan-18 Assorted Equipment Foundation Sizing
1.0.0.0 01-Jan-18 Assorted Lightning Protection Risk Assessment IEC:62305
1.0.0.0 01-Jan-18 Assorted Lightning Protection Risk Assessment IS:2309
1.0.0.0 01-Jan-18 Conductors Busbar Selection
1.0.0.0 01-Jan-18 Conductors Busbar Trunking Calculations
1.0.0.0 01-Jan-18 Conductors Cable Selection – LV System
1.0.0.0 01-Jan-18 Conductors Cable Selection – MV System
1.0.0.0 01-Jan-18 Conductors Calculation of Cross Bonding of EHV Cable (IEC:60287)
1.0.0.0 01-Jan-18 Conductors Circuit Wiring Loading & Volatage Drop
1.0.0.0 01-Jan-18 Conductors DC Cable Sizing Calculation
1.0.0.0 01-Jan-18 Conductors Parallel Operation Of Cables
1.0.0.0 01-Jan-18 Conductors Street Light Cable Selection
1.0.0.0 01-Jan-18 DG Set DG Set Exhaust Pipe Back Pressure
1.0.0.0 01-Jan-18 DG Set DG Set Foundation Sizing
1.0.0.0 01-Jan-18 DG Set DG Set Operating Cost Calculation
1.0.0.0 01-Jan-18 DG Set DG Set Sizing
1.0.0.0 01-Jan-18 Earthing Earth Resistivity Measurement Method
1.0.0.0 01-Jan-18 Earthing Earthing Conductor Costing
1.0.0.0 01-Jan-18 Earthing Earthing Network Calculation
1.0.0.0 01-Jan-18 Earthing Grid Earthing Design IEEE 80-2000 Method
1.0.0.0 01-Jan-18 Earthing Neutral Earthing Conductor Sizing IS-3043
1.0.0.0 01-Jan-18 Earthing NGR Sizing
1.0.0.0 01-Jan-18 Earthing Protective Earthing Conductor Sizing IS-3043
1.0.0.0 01-Jan-18 Earthing Protective Earthing Conductor Sizing BS:7430
1.0.0.0 01-Jan-18 Earthing Protective Earthing Conductor Sizing IEC:60364
1.0.0.0 01-Jan-18 Earthing Protective Earthing Conductor Sizing IEE
1.0.0.0 01-Jan-18 Earthing Protective Earthing Conductor Sizing IEEE:80
1.0.0.0 01-Jan-18 Electrical Panels Panel Busbar Sizing Calculations – AL
1.0.0.0 01-Jan-18 Electrical Panels Panel Busbar Sizing Calculations – CBIP
1.0.0.0 01-Jan-18 Electrical Panels Panel Busbar Sizing Calculations – CU
1.0.0.0 01-Jan-18 Electrical Panels Panel Heat Load Calculations
1.0.0.0 01-Jan-18 Motor Motor Starting
1.0.0.0 01-Jan-18 Motor Pump Motor Sizing
1.0.0.0 01-Jan-18 Short Circuit Distribution Network Short Circuit Calculations
1.0.0.0 01-Jan-18 Short Circuit Relay Setting Calculation
1.0.0.0 01-Jan-18 Transformer Harmonics K Factor Calculations
1.0.0.0 01-Jan-18 Transformer Reactor Sizing
1.0.0.0 01-Jan-18 Transformer Transformer Losses Capitalization
1.0.0.0 01-Jan-18 Transformer Transformer Tapping